• Parallel closed transition normal plus two backup generator system
    • 12,470 Volts
    • Installed (2) 2.5 MW diesel generators
    • Retrofitted (2) 1.5 MW diesel generators from 480V to 12,470V
  • Parallel 1 MW cross-tied UPS system
    • UPS system custom manufactured in standalone structure
  • New secondary service with closed transition main tie set up
  • Relocate existing utility feeders while data center was active
  • Provide new distribution and PDU’s
  • Provide and install Power Analytics smart power metering on all branch circuitry in data center